Pioneering General Planning
for Sustainable Production
Delivery of a State-of-the-Art Chemical Plant Using Green Hydrogen in the Pharmaceutical Industry
After approximately 100,000 project hours, SpiraTec AG reached a major milestone: the commissioning of a state-of-the-art chemical plant with a total investment volume in the high double-digit million-euro range for a renowned pharmaceutical client.
Use of green hydrogen
Fully automated operation
with more than 1,400 pipelines
Comprehensive general planning
incl. energy-optimized ventilation concept
Consistent use of BIM
At a Glance
2021-2026
Pharmaceutical company
Pharmaceuticals
General planning across all project phases
- Aveva Diagrams & E3D
- Autodesk® Revit
- Navisworks
- LICAD
- Rohr2
- Solar Computer

This project marks a decisive step in our company’s development. We have demonstrated that we are capable of successfully delivering even the most complex projects across locations, departments, and companies.
Complex Large-Scale Project
For SpiraTec, this is one of the first projects of this scale in the role of general planner and a compelling demonstration of the company’s expertise in delivering complex large-scale projects.
The new chemical plant operates with green hydrogen. Safety and sustainability were at the heart of the project throughout. A sophisticated ventilation system, sprinkler and foam fire-extinguishing systems, and a firefighting water retention system in the basement ensure compliance with all relevant regulations and extensive fire protection requirements.
- General planning across all project phases
- 3D plant and piping design
- HVAC
- Building services engineering / instrumentation and control
- Process control systems
- Architecture and civil engineering
- Sprinkler systems
- Building IT (in cooperation with an external partner)
- Construction and installation supervision
- Support during commissioning and documentation
Integrated project delivery
From the feasibility study through basic and detailed engineering to construction and installation supervision and commissioning, SpiraTec was responsible for the complete general planning scope.
Fully automated operation of the facility comprises more than 1,400 pipelines and follows a well-designed safety and sustainability concept:
-
Explosion relief panels for controlled pressure release
-
Sophisticated ventilation system
-
Sprinkler and foam fire-extinguishing systems
-
Firefighting water retention system in the basement
-
Compliance with all requirements
Particular attention was paid to energy optimization through an energy-efficient ventilation concept with separate supply and exhaust air systems for production and social areas, combined with high-performance heat recovery for maximum energy efficiency.
A key feature of the project was the consistent use of Building Information Modeling (BIM). Digital planning tools such as Aveva Diagrams & E3D, Autodesk® Revit, Navisworks, LICAD, Rohr2, and software solutions from Solar Computer GmbH enabled seamless integration of all disciplines.
Through interdisciplinary collaboration between Process, Piping, Civil, Automation, and E&I Engineering, SpiraTec was able to:
-
Reduce interfaces
-
Shorten project timelines
-
Increase planning reliability
-
Ensure high execution quality
The project was completed within budget and on schedule. All defined milestones were achieved.
A future-oriented project for sustainable production
with more than 1,400 pipelines
incl. energy-optimized ventilation concept
With the successful realization of this chemical facility, SpiraTec has further strengthened its position as a highly capable general planning partner. The project lays the foundation for future challenging projects, particularly in the pharmaceutical, chemical, and sustainable production sectors.
At the same time, it demonstrates how green hydrogen and modern planning technologies can work together to pave the way toward a resource-efficient, safe, and economically viable industrial future.
Does this challenge sound familiar to you?
If so, please feel free to contact us, and together we’ll find a solution.