New construction of an active ingredient production facility
Planning a new production facility is complex and poses a number of challenges. This was also the case for a German manufacturer of biopharmaceutical active ingredients at its Austrian site, which had to master the construction of a new 8-storey production building, as well as additional storage, logistics and QA buildings.
Modular automation system
Complete EMSR assembly
and instrumentation
Project management
and production support
At A Glance
Manufacturer of biopharmaceutical active ingredients
Biopharma
- Construction and Assembly Management
- Implementation modular automation system

Construction and Installation Management for All Trades
onoff automation services gmbh (onoff) was commissioned to supply and implement the complete EI&C assembly and instrumentation of the production facilities, as well as to implement a reporting system (CNS) and environmental monitoring system (EMS).
The figures show just how complex this task was: onoff took over the construction and installation management of all trades with around 40 subcontractors and suppliers.
- Central monitoring of the production, laboratory and storage areas with an EMS monitoring system
- Complete instrumentation, installation, commissioning and qualification of the automation for auxiliary systems (utilities)
- Planning, engineering, delivery, installation and commissioning including qualification of the EMS monitoring systems
Modular automation system
-
Supply and manufacture of 400 RIO cabinets for Utilities and 3 EMS monitoring systems as well as 20 RIO cabinets
-
Delivery, assembly and cabling of 1,000 field devices for the automation of the EMS system and 3,640 field devices for the automation of utilities
-
Creation of circuit diagrams for the 3 EMS systems
-
Project planning for Experion application (EPKS), IQ implementation of EPKS automation
-
Creation, commissioning and qualification of 3 EMS monitoring systems with PCS 7
-
Creation, commissioning and qualification of the automation for the utilities area together with Honeywell automation system EPKS
-
Installation of a central notification system (CNS) for faults and safety instructions for employees on site
Smooth coordination of assembly and commissioning
and instrumentation
and production support
Thanks to the smooth coordination of assembly and commissioning by the companies involved, the project objective was achieved without any significant delays in the individual trades.
Thanks to the modular automation system implemented by onoff, the customer is able to realize a highly flexible production of active ingredients for several products with short changeover times. As a result, production can react quickly to the respective customer and market requirements within a short period of time.
Does this challenge sound familiar to you?
If so, please feel free to contact us, and we’ll work together to find a solution.